Suzhou orl power engineering co ., ltd

Suzhou orl power engineering co ., ltd Specializing in the production boiler unit China suppliers

Manufacturer from China
Active Member
9 Years
Home / Products / CFB Boiler Header /

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

Contact Now
Suzhou orl power engineering co ., ltd
Country/Region:china
Contact Person:MrAllen Liu
Contact Now

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

Ask Latest Price
Video Channel
Brand Name :ORL Power
Model Number :Customization
Certification :ISO9001/SGS/TUV/ASME/EN
Place of Origin :Zhangjiagang,Jiangsu,China
MOQ :Negotiation
Price :Contact me | Get Latest Price
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :500Ton/Tons per Month
Delivery Time :50~100 Days
Packaging Details :Iron Frame Package
Name :CFB Boiler Header
Type :Natural Circulation/Once Through
Usage :Industry/Power Station
Structure :Fire/Water Tube
Pressure :High/Low Pressure
Style :Style
Fuel :Coal/Gas/Oil-fired, Water Heat
Pipe :Large Diameter Welded Pipe
Dimension(L*W*H) :Customization
Weight :10~1000ton
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

CFB Boiler Header Description

CFB Boiler Header, or boiler manifolds are designed to simplify piping near the boiler, reduce installation time, labor costs and parts used. Available in various branch options with threaded inlet and outlet connections. For closed loop heating applications only.

The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.

CFB Boiler Header Performance advantage


The key to the manufacture of the header is the welding of the end cap (or head). When welding, most manufacturers use manual arc welding, because the weld is single-sided welding, the root quality is difficult to guarantee, and because of the huge of welding work, number of repairing times, the production cycle is long which cause the entire production process slow. Our company adopt the advanced production technology, well-equipped instrument and sophisticated technology, and invented a submerged arc welding method during the header and cover welding. The character is: In the submerged arc welding machine head threading mechanism fixed connection welding wire guide, along the wire guide head to set the wire guide hole, the wire lead head has a certain degree of curvature, welding the inner wall, the wire guide head extension Into the inside of the welding. The welding method mainly solves the problem that the existing welding method of the boiler header and the end cap (or the head) has the advantages of low processing efficiency, waste of argon at the time of processing, need to open the groove, have many processes, high processing cost and unsatisfactory welding fabrication.

Compact Structure CFB Boiler Header With Large Diameter Welded Pipe

FAQ

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

Inquiry Cart 0